Posts by pwsadmin
King County WTD – West Point Treatment Plant OGADS Modifications
Description The project involved considering modifications to or replacements of, the oxygen generation facility and the oxygen dissolution system, including the surface aerators, motors, and generators. The project team identified and evaluated a pool of alternatives for improving the energy efficiency of the oxygen generation and oxygen dissolution systems, identified 2-4 best apparent alternatives for…
Read MoreKing County WTD – North Lake Sammamish Flow Diversion Project
Description The contract entails engineering planning, design and related services for the diversion of up to 42 mgd of 20-year peak flow from the North Lake Sammamish Basin to the Brightwater Treatment Plant by 2021. The contract will be performed in phases and P&M is anticipated to support the Alternative Analysis, Predesign through Final Design.…
Read MoreSound Transit – Construction Management Services for Sounder Commuter Rail (Multiple Projects)
Description Lakewood Layover Yard Expansion Design-Build consisted of constructing additional track (2 turn outs) and modifying signals; completing drainage improvements and increasing electrical power to accommodate additional wayside power and yard lighting; T&E building, storage building and compressor building, new parking lot and significant grading throughout the site. Point Defiance Bypass (Design-Bid-Build) consisted of construction of a…
Read MorePort of Seattle – North SeaTac Airport Renovations (NSTAR) Program Management and Controls Services
Description The project, North SeaTac Airport Renovations (NorthSTAR) program includes renovations to the North Satellite (NSAT), Concourse C, Concourse D and the Main Terminal. The program entails upgrades and modifications to existing facilities at SeaTac International Airport to accommodate Alaska Air Group (AAG) goals to relocate to the NSAT, to improve passenger service, to replace…
Read MorePort of Seattle – Terminal 5 Berth Modernization Program Controls
Description The project work includes multiple interconnected terminal development elements which are generally categorized as survey and inspection of existing conditions; waterside and landside crane rail reconstruction; rehabilitation of existing distressed dock structural elements; fender system replacement; underwater retaining wall construction; berth deepening; ground improvement; supply of electrical power and communication for new cranes and…
Read MoreUS Navy – Seaplane Base Wastewater Treatment Plant for Naval Air Station Whidbey Island, WA
United States NAVFAC Northwest Architect-Engineer Services for the Seaplane Base (SPB) Wastewater Treatment Plant General Sewer Plan for Naval Air Station Whidbey Island, Oak Harbor, Washington Responsibilities P&M as a subcontractor to CDM Smith was awarded the Cost Estimating element of the A-E services associated with engineering evaluation and recommendations for repairs, rehabilitation, equipment replacement…
Read MorePort of Seattle – Clean Truck Program Grant Administration, Project Controls and Auditing Services
Description The Implementation of the program, also known as Scrappage and Replacement for Air in Puget Sound (ScRAPS2), is through another entity in partnership with the Port. The program provides financial incentives to eligible truck owners to promote replacement of 220 or more, older drayage trucks that serve the Port’s marine terminals to meet federal…
Read MoreCity of Seattle Public Utilities (SPU) – Combined Sewer Overflow (CSO) Program Management Services
Description P&M teamed with CH2MHill Engineers, Inc., as a sub-consultant to provide project controls, scheduling & estimating services for the CSO Program Management project. One of the projects under this program is the Long Term Control Plan that includes several new CSO projects that are in various phases of development. The long range plan will…
Read MoreKing County – EVM & CFP Ryerson Lift Replacement
Description The Ryerson Lift Replacement project includes replacing eight aging lifts at Ryerson Base. Responsibilities P&M developed an Earned Value Management (EVM) / Cash Flow projection (CFP) tool and methodology to be utilized for the King County Ryerson Lift Replacement project. The scope of work further included evaluation and integration of Microsoft Project software in…
Read MoreSound Transit – Construction / Program Scheduling for East Link High Capacity Transit Corridor Final Design
Description In March 2012, P&M entered into a Sub-consultant Agreement with the HNTB-Jacobs-Hatch Mott MacDonald (H-J-H) Final Design Partners for the East Link South Bellevue to Overlake Transit Center Final Design. The project would bring the proposed transit corridor from 30 to 100 percent design determining the technical specifications for the stations, bridges, tracks and…
Read More