Posts by pwsadmin

King County WTD – Mechanical and Electrical Engineering Services On-Call

Description King County’s wastewater system facilities comprise three large regional wastewater treatment plants (WWTP), two small WWTP, one community septic system, four combined sewer overflow (CSO) treatment facilities, over 391 miles of sewer pipelines, 25 regulator stations, 47 pump stations and 38 CSO outfalls. This work order provides services to enable WTD respond effectively to…

Read More

King County WTD – Project Formulation Program

Description The objective is to improve the cost estimates at the project development stage. Its primary intent is to reduce the difference between initial and finished actual project cost and schedule information through the improved understanding of costs and schedule impacts prior to project approval.  The scopes of existing potential projects (also known as Needs)…

Read More

King County WTD – Generator Installation Projects at the Denny Way Regulator Station Facility and the Lakeland Hills Pump Station

Description This project provides engineering services to perform two WTD projects that both involve installing standby power generators at existing facilities: the Denny Way Regulator Station Facility and the Lakeland Hills Pump Station. The objective of the combined project is to provide permanent standby power generation at two facilities, the Denny Way Regulator Station Facility…

Read More

King County WTD – South Plant Raw Sewage Pumps (RSP) Medium Voltage Switchgear Replacement

Description The purpose of this contract is to provide project planning, a review of the Basis of Design Report, existing transformer assessment, preliminary and final design engineering, services during construction, and related services to King County (KC) Department of Wastewater Treatment (WTD) for the South Plant Raw Sewage Pump (RSP) Medium Voltage Switchgear Replacement Project.…

Read More

Port of Seattle – International Arrival Facility Program Management and Controls Services

Description  The Port of Seattle is being expanded with an International Arrivals Facility (IAF) at Seattle-Tacoma International Airport. With this 1970’s vintage facility in the south satellite servicing a dramatic increase in international flights, the existing Federal Inspections area (commonly known as customs) is beyond its peak capacity. The new IAF is expected to create…

Read More

Port of Seattle – South Satellite Renovations Project Management and Controls Support Services

Description The South Satellite serves a mix of common use domestic and international carriers.  The renovations and expansion of South Satellite objective is to meet current building and structural minimum code requirements and airport standards to effectively handle current and growing passenger volumes. It also aims to fulfill a commitment the Port made to the international…

Read More

City of Seattle Public Utilities (SPU) – Project Planning & Control On-Call Consultant Support Services

Description In August 2009, the City of Seattle retained P&M as a Prime Consultant on an on-call basis, to provide project planning and control support services on selected projects. Examples of services include but are not limited to development of Project Management Plans (PMP’s); monitoring and controlling of on-going PMP’s; and, business processes and tools…

Read More

King County WTD – Georgetown Wet Weather Treatment Station

Description In 2012, the King County Council adopted an amendment to the Long Term Combined Sewer Overflow (CSO) Control Plan (LTCP) to address the County’s remaining CSOs. CSO reductions are required by state and federal regulations and are the subject of a consent decree between the County, the Washington State Department of Ecology, and the…

Read More

King County WTD – Kent/Auburn Conveyance System Improvements Project

Description The purpose of this contract is to provide construction management services to King County Department of Natural Resources and Parks for Kent/Auburn Conveyance System Improvements Project. The following pipeline projects will be constructed as part of the Kent/Auburn CSI project: Pacific Pump Station Discharge. All of the flow from the Pacific Pump Station will…

Read More

King County WTD – West Point Treatment Plant Controls System Replacement

Description P&M supported CH2M Hill performing electrical engineering design support for the King County West Point Treatment Plant, Controls System Replacement EPS, Chlorination, Water re-use and Incineration. This project is located within the West Point Wastewater Treatment Plant and is aimed at replacing the current control systems with new digital controls systems. Responsibilities P&M provided…

Read More