85 MW Simple Cycle Dual-Fuel Power Plant – Bowling Green, Florida
Description
The 85 MW Bowling Green facility is an expansion of Hardee Power Station. It involved the addition of a GE PG7121EA combustion gas turbine in simple cycle, designed to burn natural gas and no. 2 fuel oil to the existing facility.
Technology
One GE PG7121EA dry low nox combustion gas and no.2 fuel oil turbine generator set
Scope of Work
Engineering, procurement, construction and startup
Schedule
Six months from full notice to proceed to commercial operation completed in 2000
Value
Approx. EPC value $30M
Responsibilities
Project controls to include preparation of CPM schedules (P3); cost controls; cash-flow management; change order management; forecasting; tracking of installed quantities; earned value management and other project controls efforts.