Posts by pwsadmin
Great Belt East Bridge
Description Highway suspension bridge (gravity-anchored) between the island of Sprogoe and Zealand. Main span of 1.624 km (approx. 1 mile), total length of 6.8.km (approx. 4.3 miles) and with a pylon height of 254 m (approx. 760 feet). Built 1991 thru 1998. Value Approx Construction Value $1B (1991) Responsibilities Maintenance of Owner’s Program Master schedule…
Read MoreGreat Belt East Tunnel
Description Railroad tunnel (TBM) between the island of Funen and Zealand. Total length of 27.4 km (approx. 24.6 miles) and interior diameter of 7.7m (approx. 23 feet.). Built 1991 thru 1998. Value Construction costs were equal to $330 million U.S. dollars (1996) Responsibilities Project controls and preparation of detailed construction CPM schedule. Maintenance of owners…
Read MoreGreat Belt Link Railway Tunnel
Description A/S Øresundsforbindelsen landworks on Zealand. The landworks comprised facilities for a railway freight line, a tunnel for passenger trains and a railway bridge. Value Approx. Value $140M (1996) Responsibilities Project controls services for the construction management organization. The services included planning and control of CPM schedules; implementation of risk management; cost control; successive risk…
Read MoreRailway & Underground Station at Copenhagen Airport
Description Highway and Railway at Copenhagen Airport, Kastrup, between 1996-1998. This project included an underground station located at the Copenhagen Airport and tunnel on both sides of the station. Also, included was the rerouting of a number of roads in front of the airport. The Øresund Highway opened in 1997 and the railway opened in…
Read More